November, 2015
Boing Boing – Part 3
As we had left the build with the A frames being assembled, it is now on to fitting those completed parts to the main frame of the trike.
Boing Boing – Part 2
Last time we had just finished the installation of the inner bearings on the A arms and had prepped up ready to install the outer bearings.