May, 2016
Go Go Juice Required! (part 2)
With the forward half of the fuel lines laid in it is time to start on the rear half of the pipework. As the whole run is in stainless steel armoured flexible piping I worked out how I wanted the run to go by zip tieing temporarily in place and then drilling a hole for […]
Go Go Juice Required!
With the electrics on hiatus until the rear mudguards are complete I moved onto another important step and that was to fit the fuel line from the tank all the way to the engine.
Just Keep Swimming (part 3)
Just a quick update. With the majority of the wiring laid in, it’s time to start neatening everything up and to make it all presentable for the MSVA. One of these steps is mounting all the fuse boxes.